Sunday, July 5, 2009

Deck Project Progress

Last September brother Charlie and I removed the upper deck railing and replaced it with a new style. That project continues...
With some assistance from friends Roger and Dick, the lower deck railing has been removed. All spindles from the upper and lower deck have been redesigned, reconditioned and painted, ready for installation. A new set of stairs will be added to the lower deck to reduce the current up and down travel and distance to get from the lower deck to ground level.

The new railing has been painted and the entire deck structure has been pressure wash, sanded and painted awaiting installation of the new railing and steps. Stay tuned...



No comments: